Second-Storey Additions in the GTA

Add a full floor without giving up your yard or leaving your neighbourhood.

Roof framing exposed during a re-roofing project

Second-storey additions let you add bedrooms, bathrooms or a whole new floor without giving up any of your yard. It is a bigger undertaking than most renovations, so a structural review always comes first, and every decision after that builds on what the existing house can carry.

We coordinate the structural work, the new framing and roof, the stair connection and the services that need to reach upstairs. Careful sequencing and weather protection keep the house safe while the roof is open, and the finished floor is built to match the rest of the home.

Going up is a rewarding way to stay in a neighbourhood you love, but it is a serious project and we treat it like one. Before anything else we want to know what your foundation and walls can carry. We would rather tell you honestly that a house can't take a second floor than start and find out later. If it can, the result is a lot of new space without giving up an inch of yard.

House exterior with new framing and windows on a raised foundation

What's included

  • Structural review of the existing house
  • Reinforcement of the walls and foundation where required
  • New floor framing, walls and roof structure
  • Temporary weather protection during the build
  • Stair opening and connection between floors
  • Electrical, plumbing and heating extended upstairs
  • Insulation, drywall and full interior finishing

How the project unfolds

  1. Review the structureWe assess what the house can support before any design is final.
  2. Plan and prepareLayout, stairs and services are planned, and the site is prepared.
  3. Build upwardThe new floor and roof go up with weather protection in place.
  4. Finish the new floorServices, insulation and interior finishes complete the space.
Staircase with a glass railing, wood treads and marble-look floors

Options and finishes

  • Full second floor over the existing footprint
  • Partial second-storey sections
  • Primary suite with ensuite upstairs
  • New staircase design and railings
  • Vaulted or sloped ceilings

Typical timeline

A second-storey addition is a major project that often takes several months, and the schedule depends on the design and the season.

Questions

Second-Storey Additions: common questions

Can my house support a second storey?

It depends on the foundation and framing. A structural review is always the first step, and we never assume a house can take a second floor without one.

Do we need to move out during construction?

Many families move out for part of the work, especially when the roof is open. We walk through options with you early so you can plan.

How do you protect the house when the roof comes off?

We stage the work so the roof is open for as short a time as possible and use temporary protection to keep the interior dry.

How do we get upstairs once it is built?

A new staircase is designed as part of the project. We consider where it fits, how it affects the rooms below and what finish suits your home.