Kitchen and bath

Bathroom Renovation in the GTA

Showers, tubs, tile and vanities, waterproofed properly and finished cleanly.

Bathroom with an oval LED mirror, floating vanity and green marble shower wall

Bathroom renovation looks simple from the outside and is anything but, since water finds every shortcut. We rebuild bathrooms from the substrate up, with proper waterproofing behind every tiled surface, so the finished room looks good now and still looks good in ten years.

Whether you want a walk-in shower in place of a tired tub, a double vanity, heated floors or a full spa-style rebuild, we plan the room around the way you use it. One team handles the plumbing, tile, glass and carpentry, so nothing is left waiting on another trade.

The difference between a bathroom that lasts and one that doesn't is almost entirely hidden. It is the membrane behind the tile, the slope of the shower floor and the quality of the fan. We would happily show you photos of those layers at every stage, because they are what you are really paying for. The tile on top is the part you get to enjoy, and it only looks good if the rest is right.

Bathroom with a freestanding tub, glass shower and pebble tile floor

What's included

  • Demolition and careful removal of old tile, tubs and fixtures
  • Subfloor repair and levelling where needed
  • Waterproofing membrane behind shower and tub surfaces
  • Plumbing updates for new fixtures and valves
  • Tile installation on floors, walls and niches
  • Vanity, mirror and lighting installation
  • Glass shower enclosures and hardware fitted to your layout

How the project unfolds

  1. Plan the layoutWe map where the shower, vanity and storage go and what the room can hold.
  2. Strip and prepareOld finishes come out and the walls and floor are built back flat and dry.
  3. Waterproof and tileMembranes go in first, then tile is set carefully with even lines.
  4. Fit and finishFixtures, glass, mirrors and lighting go in and everything is tested.
Bathroom with a frameless glass shower, freestanding tub and marble-look floor

Options and finishes

  • Curbless and walk-in showers
  • Freestanding tubs and soaker tubs
  • Floating vanities and double sinks
  • Heated floors and niche lighting
  • Large-format or patterned tile

Typical timeline

A bathroom renovation often runs a few weeks, depending on the size of the room, the amount of plumbing change and the lead time on glass and vanities.

Questions

Bathroom Renovation: common questions

Why does waterproofing matter so much in a shower?

Tile and grout are not waterproof on their own. A proper membrane behind them stops moisture from reaching the framing, which is the most common cause of bathroom failures.

Can you replace a tub with a walk-in shower?

Yes, and it is one of our most requested changes. We rebuild the wall and floor to suit the new shower and choose a drain and layout that fits the room.

How do I choose between glass styles?

Frameless glass feels open and is easy to keep clean, while framed or sliding doors can suit tighter rooms. We walk through the options for your layout.

Will I have a working bathroom during the project?

Not usually in the room being renovated. If it is your only bathroom, call us and we will go over ways to keep disruption as low as possible.

Ready to start your renovation?

Calls answered 24 hours a day, 7 days a week. Call us, or send a few details and we will get back to you.

Call 24/7Free Quote